FIRE BAN
NOT IN EFFECT

Home
County Council
The County
Office
County Profile
Economic Development
Business Permits
Industry Liaison
Agriculture Service Board
Taxes & Assessment
Planning & Development
Natural Gas
Waste Collection & Hauling
Water & Sewer Services
Protective Services
Public Works
Hamlets & Resorts
Town & Villages
Parks & Recreation
Family & Community Services
FAQ's
Useful Links
Jobs with the County
Contact Information
Contact Us
Search Site
|
Public Works
Contact and department information...

Notice to Register Contract Equipment
Owners of gravel truck(s) with belly dump trailer(s), water truck(s) and
road construction equipment are asked to register their equipment at the
County Shop. All owners must complete a Registration Form, outlining the
equipment description, model, serial number, year as well as proof of
insurance coverage, with two million dollars liability and WCB Account.
Public Works Manager Report
Smoky Lake
Public Works Department had a very challenging 2009 with the very dry
conditions throughout the summer. The maintenance crew had the difficult
task of keeping the roads free of washboard conditions and for the most
part, kept the problem to a minimum.
As in 2008, Public Works is continuing with the clearing of the
intersections for better site lines, which provide for safer
driving conditions. The Hydro-Axe Program for clearing right-of-ways
will change in 2010, having a full-time crew working throughout the
year, with the exception of where excessive snow amounts prohibit
further clearing.
We will continue to provide dust control on heavily traveled roads with
either oil, treatment or MG-30. As well, Smoky Lake County continues to
provide private dust control at a cost outlined further in this
booklet. The charts following will outline the 2010 scheduled projects.
Our maintenance and culvert crews are gaining ground on the various
drainage problems throughout the County. I am confident if we continue
with this Program, the County will be able to minimize future flooding
and wash-outs.
We are continuing with our Rock Excavation Program as well as the annual
Gravel Crushing at White Earth Pit.
Once again, thanks to the County Ratepayers for their patience during
last years time of drought. Our very capable staff continues to strive
to provide the best service possible to enable safe and comfortable
travel throughout the year.
Doug Ponich
Public Works Manager
2010 Gravel Rates (per tonne)
|
Material |
Ratepayers |
Others |
|
Material only |
$12.00 |
$14.00 |
|
With Delivery (Tandem) |
$20.00 |
|
|
With Delivery (Belly Dump) |
$17.00 |
|
2010
Sand Rates (per tonne)
|
Material |
Ratepayers |
Others |
|
Material only |
$4.00 |
$6.00 |
|
With Delivery (Tandem) |
$12.00 |
|
|
With Delivery (Belly Dump) |
$9.00 |
|
Belly Dump
Average loaded weight 28.60 tonne
Average total truck weight loaded 45.5 kg
Delivered Gravel Tandem
Average loaded weight 12.47 tonne
Average total truck weight loaded 22.5 kg
2009
Completed Road Projects
PAVING , OIL TREATMENT & BASE STABILIZATION
|
Project
Name |


Days |
Length |
Estimate |
Actual |
|
Twp 600 between RR 181-182 |
1 |
.75 |
62,660.00 |
63,578.20 |
|
Hamlet of Spedden |
|
|
14,580.365 |
14,157.27 |
|
RR 124 North of Hwy 28 |
2 |
1.5 |
94,599.00 |
103,578.00 |
|
Repair RR 180 North of Twp 594 |
2 |
1 |
57,832.00 |
69,111.59 |
|
Twp 620 between RR 133 - 135 |
|
1.25 |
Reallocated |
125,999.48 |
|
Bonnie Lake Resort Tennis Court |
|
|
Reallocated |
31,600.00 |
|
Saddle Lake Road |
2 |
4.5 |
66,080.00 |
95,396.42 |
|
Goodfish Lake Road |
3 |
8.5 |
124,820.00 |
122,182.74 |
|
Twp 620 between Hwy 36 RR 133 |
2 |
6 |
88,110.00 |
Cancelled |
|
Twp 584 between Hwy 859 RR 144 |
2 |
5 |
72,296.00 |
Moved to 2010 |
|
Twp 590 between RR 180 183 |
5 |
3 |
65,270.00 |
42,810.06 |
|
Twp 584 between RR 181 184 |
5 |
3 |
65,270.00 |
64,827.91 |
|
RR 170 between Twp 601 602 |
2 |
1 |
30,000.00 |
31,987.24 |
|
Twp 602 between RR 170 164A |
3 |
1.5 |
44,000.00 |
27,206.02 |
|
RR 162 between Hwy 28 Twp 600 |
2.5 |
2.5 |
46,530.00 |
21,832.60 |
|
RR 163 between Twp 600 602 |
1 |
2 |
27,120.00 |
22,080.71 |
|
Twp 602 between RR 163 164 |
1 |
1 |
13,560.00 |
10,114.04 |
|
RR 170 between Hwy 28 Twp 600 |
3.5 |
2 |
54,000.00 |
56,969.13 |
|
Twp 600 between RR 180 RR 183 |
1 |
2.25 |
30,515.00 |
24,186.85 |
|
RR 183 between Twp 600 602 |
1 |
2 |
25,125.00 |
Moved to 2010 |
|
RR 191 between Hwy 28 Twp 600 |
2 |
3.5 |
47,465.00 |
32,960.16 |
|
Total |
41 |
52.25 |
$1,029,832.35 |
$ 960,578.42 |
REHABILITATION
|
Project
Name |
Days |
Length |
Estimate
|
Actual |
| Twp 604 between RR 192A 181 |
5 |
4 |
89,715.00 |
110,804.30 |
| RR 181 between Twp 604 610 |
4 |
2 |
94,875.00 |
166,802.22 |
|
Twp 610 between RR 181 Hwy 855 |
5 |
4 |
79,745.00 |
107,200.34 |
| Twp 604 between RR 124 131 |
3 |
3 |
60,425.79 |
18,983.79 |
| RR 135 between Twp 600 602 |
2 |
2 |
40,116.00 |
14,808.19 |
| RR 182 between Hwy 28 Twp 590 |
3 |
2.5 |
44,685.00 |
29,175.72 |
| RR 174 between Twp 590 Hwy 28 |
3 |
2 |
44,685.00 |
Moved to 2010 |
| RR 162 between Hwy 28 Twp 593 |
1 |
1 |
18,624.00 |
3,850.92 |
| Twp 610 between RR 170 163 |
3 |
3.4 |
61,540.00 |
Moved to 2010 |
| RR 163 North of Hwy 28 |
1 |
.5 |
6,340.00 |
4,266.46 |
| RR 195 North of Hwy 28 Twp 594 |
2 |
2 |
36,372.50 |
21,980.31 |
| RR 195 between Twp 594 600 |
2 |
2 |
36,372.50 |
Moved to 2010 |
| RR 170 between Hwy 28 Twp 590 |
2 |
3 |
31,250.00 |
63,576.23 |
| Resort: Road Stabilization for
Paving |
|
|
97,349.89 |
Moved to 2010 |
| RR 164 South of Twp 584A |
|
|
5,000.00 |
3,335.82 |
|
TOTAL |
36 |
31.4 |
$747,095.68
|
$ 544,784.30 |
CONSTRUCTION Contracted Out
| Project Name |
Days |
Length |
Estimate |
Actual |
| RR 131 between Twp 580 583A |
18 |
2.3 |
270,760.00 |
257,872.42 |
| TOTAL |
18 |
2.3 |
$ 270,760.00 |
$ 257,872.42 |
2010 Road Projects
PAVING, OIL
TREATMENT
| Project Name |
Days |
Length |
Estimate |
| Saddle Lake Road |
6 |
4.5 |
|
| Goodfish Lake Road |
11 |
8.5 |
|
|
Twp 620 between RR 134A - 140A |
3 |
2.25 |
|
|
RR 170 between Twp 590 - 592 |
2 |
2 |
|
|
RR 170 between Twp 602 - 600A |
2 |
1.25 |
|
|
Twp 602 between RR 170 - 164 |
3 |
1.06 |
|
|
RR 180 between Twp 595 - 600 |
2 |
1 |
|
|
RR 183 between Twp 602 - 601 |
1 |
1 |
|
|
Hamlet of Bellis |
|
|
|
|
TOTAL |
30 |
21.56 |
$3,053,734.73 |
BASE STABILIZATION
|
Project Name |
Days |
Length |
Estimate |
|
Twp 584 between Hwy 859 - RR 144 |
5 |
5 |
72,296.00 |
|
Twp 584 between Hwy 855 - RR 170 |
2 |
4 |
44,000.00 |
|
Twp 612 between RR 173 - 174A |
1 |
1.5 |
21,450.00 |
|
Twp 6904 between RR 181 - 192A |
3 |
4.5 |
146,997.00 |
|
RR 610 between RR 181 - Hwy 855 |
3 |
4 |
130,664.00 |
|
RR 181 between Twp 610 - 604 |
2 |
2 |
65,332.00 |
|
Twp 612 between RR 174A - 175 |
1 |
1 |
7,409.50 |
|
Twp 610 between Hwy 855 - RR 170 |
2 |
2 |
45,600.00 |
| |
19 |
24 |
$ 533,748.50 |
REHABILITATION
|
Project Name |
Days |
Length |
Estimate |
|
Twp 610 between RR 181 Hwy 855 |
5 |
4 |
18,511.98 |
|
RR 174 between Twp 590 Hwy 28 |
3 |
2.5 |
45,000.00 |
|
Twp 592 between RR 170-171 |
1 |
1 |
18,000.00 |
|
RR 170 between Twp 595 600 |
2 |
1 |
25,000.00 |
|
RR 195 between Twp 594 600 |
2 |
2 |
38,000.00 |
|
RR 164 south of Twp 584A |
|
|
1,664.18 |
|
Resort: Road Stabilization for Paving |
|
|
197,349.89 |
|
TOTAL |
13 |
10.5 |
$ 343,526.05 |
CONSTRUCTION - Contracted Out
|
Project Name |
Days |
Length |
Estimate |
|
RR 140 between Twp 590 584 |
30 |
2 |
294,000.00 |
|
RR 131 between Twp 580 - 583A |
|
2.3 |
12,887.58 |
|
TOTAL |
30 |
4.3 |
$ 306,887.58 |
|
CONTACT
Public Works Manager
Doug
Ponich
2009 Public Works Manager Report
Application for Dust Control
2010 Projects
2009 Projects Completed
|